External Insulation
Plaster
-
Waterproofing is achieved in rain- and water-exposed areas such as terraces and balconies through the use of WELTEZ insulation products.
-
The material is breathable.
-
It prevents condensation, mold, moisture, and sweating.
-
Due to its natural composition, it contains no carcinogenic substances.
-
Its lightweight nature protects the building from unnecessary loads.
-
It offers effective fire protection.
-
Provides both thermal and sound insulation simultaneously.
-
Thanks to its hydrophobic (water-repellent) properties, it prevents moisture accumulation on terraces.
PRODUCT TECHNICAL SPECIFICATIONS

Time Factors
Drying Time: 8 hours at 20°C and 65% relative humidity (RH)
Full Curing Time: 28 days at 20°C and 65% RH
Ready for Painting: 52 hours at 20°C and 65% RH
Plastering Time: 60-90 minutes at 20°C
Setting Time: 120-180 minutes at 20°C and 65% RH
Shelf Life: 1 year from production date under ideal conditions (store in a dry place at 5-35°C)
Packaging and Appearance
Packaging: Polyethylene-reinforced kraft paper bags
Color: Pure White (RAL 9010)
Density: Granular form: 175 ±5 kg/m³
Solid form: 340-365 kg/m³


Thermal and Acoustic Properties
Thermal Conductivity: 0.045 W/m·K (tested according to EN 12667)
Sound Absorption: 25 dB at 500 Hz with 3 cm thickness
Fire Resistance: Non-combustible Class A1/A2 (according to EN 13501-1)
Strength Properties
Compressive Strength: Interior: ≥0.7 N/mm² (at 23°C and 50% relative humidity)
Exterior: ≥1.0 N/mm² (at 23°C and 50% relative humidity)
Adhesion Strength: 0.40 N/mm² (measured according to EN 1015-12)
Bending Strength (N/mm²): Interior: ≥0.5 N/mm² (after 28 days curing)
Exterior: ≥0.8 N/mm² (after 28 days curing)


Water Properties
Capillary Water Absorption: 0.3 kg/m²·√h (measured according to EN 1015-18)
Total Water Absorption: <15% (measured according to EN 1015-10)
Application Information
Application Method: PFT G4/G5 spraying machine or stainless steel trowel
Application Thickness: Minimum 5 mm, maximum 50 mm in a single layer
Consumption: 8 kg covers approximately 3 m² at 1 cm thickness
Cracking: No cracks between 5 mm and 50 mm thickness

HOW TO APPLY?
WALL PREPARATION
-
The surface to be plastered must be free of oil, dirt, dust, and paint. For special applications (rough walls), the adhesion value of the plaster can be increased if necessary.
-
For walls made of brick, pumice block, etc., it is sufficient to wet the surface and remove dust.
-
Main battens are nailed or glued and mounted according to the desired insulation thickness.
-
The wall is prepared and ready for insulation application.
-
One bag (60 liters) of plaster can cover 3 m² of wall area at 1 cm thickness.
WELTEZ PREPARATION AND APPLICATION STEPS
For 1 kg of dry WELTEZ:
-
Pour 0.225 liters of water into a clean tank to keep small components in suspension.
-
Add all 1 kg of material into the tank at once.
-
Add another 0.600 liters of water to the tank.
-
Mix the material for 3 minutes with up-and-down and circular motions.
-
Check the plaster consistency with a trowel.
-
Apply this mixture to the relevant surface by hand or machine.
-
This mixture must be used within 2 hours.
WATER RATIOS
For 1 kg of WELTEZ dry plaster (Total water: 0.825 L)
-
Step 1: 0.225 L water
-
Step 2: 0.600 L water
For 8 kg of WELTEZ dry plaster (Total water: 6.6 L)
-
Step 1: 1.8 L water
-
Step 2: 4.8 L water
For 16 kg of WELTEZ dry plaster (Total water: 13.2 L)
-
Step 1: 3.6 L water
-
Step 2: 9.6 L water
IMPORTANT NOTES
-
To ensure proper distribution of the small polymer components in the bag, all material must be poured into the tank at once.
-
The desired insulation material can be customized during the production process with polymer recipes according to the climate (hot–cold–humid–dry, etc.) and the surface type (e.g., vibrating metal factory wall).
-
The prepared mixture must be consumed within 2 hours.
-
During application, the ambient temperature should be above 5°C.
Drying Time:
-
After 8 hours (at 20°C): Weltez becomes workable.
-
After 10 days (at 20°C): Special tests can be performed.
-
After 28 days (at 20°C): Full drying (calcification) is achieved.